Define the package
For multi-unit or commercial work, identify the buildings or phases included, the number of levels and the structural framing shown on the plans. List the interfaces with concrete, steel, trusses, sheathing and other trades so everyone understands where the framing scope starts and ends.
Bring the current documents
Share coordinated architectural and structural drawings, relevant schedules and the latest revision list. Include truss and engineered-product information when available. Flag pending design items and route structural questions through the project engineer.
Discuss site logistics early
Describe delivery access, unloading, staging space, work sequence and any site rules the builder has set. If lifting equipment, phased access or shared work areas are part of the plan, identify who coordinates them. Do not assume those items are included in a framing price.
Set handoffs and inspections
Agree who handles permit communication, inspection bookings, deficiency follow-up and approval of drawing changes. The project team should confirm inspection requirements for the specific permit and building type before work is covered.
Before you request an estimate
- Current architectural and structural drawings with revision dates
- Project type, approximate area and number of levels
- Framing work to include, with known exclusions
- Target start window, delivery access and site notes
If some information is not ready, label it as pending. The team can tell you what is needed next.
Common questions
What should I send first?
Send the latest drawings, a short scope description, the project location and a target start window.
Can you review a project while the drawings are in progress?
Yes. Label the set as preliminary and identify what is still being developed. A proposal may need revision when the design changes.
Does a service-area page confirm a start date?
No. Moonlite confirms project fit and availability after reviewing the scope and schedule.