Line up a realistic start
Share the expected foundation or floor-system readiness date, the project stage and the target framing window. If other work must finish before the crew arrives, name it. A start date is only useful when the drawings, site and materials can support it.
Send one coordinated drawing set
Include current plans, structural details, sections, elevations, schedules and revisions. Add truss placement or engineered-lumber drawings when available. If a sheet is still being developed, label it clearly so it is not mistaken for an approved construction detail.
Keep material handling in the plan
Let us know where trucks can unload, whether the site has room to stage lumber, and what needs protection from weather. Include any known access limits or sequence restrictions. This helps the team discuss delivery timing and work order before a proposal is finalized.
Agree on inspection responsibilities
Identify who books each required inspection, who meets the inspector and who tracks any deficiencies. The permit holder and project team should confirm the actual inspection sequence for the job; it can vary by project.
Before you request an estimate
- Current architectural and structural drawings with revision dates
- Project type, approximate area and number of levels
- Framing work to include, with known exclusions
- Target start window, delivery access and site notes
If some information is not ready, label it as pending. The team can tell you what is needed next.
Common questions
What should I send first?
Send the latest drawings, a short scope description, the project location and a target start window.
Can you review a project while the drawings are in progress?
Yes. Label the set as preliminary and identify what is still being developed. A proposal may need revision when the design changes.
Does a service-area page confirm a start date?
No. Moonlite confirms project fit and availability after reviewing the scope and schedule.