Give the project context
Start with the project type, number of levels, approximate area, design stage and intended start window. If you are comparing contractors, share the same plan revision and scope with each one. That is the fairest way to compare what is included.
Send the structural information
Include the architectural set, structural plans, sections, foundation details, floor and roof layouts, and engineered-member or truss drawings that are available. Mark pending information clearly. Questions about design or structural adequacy belong with the project’s qualified design professional.
Plan deliveries and sequence
Describe where materials can be unloaded and stored, how the crew will reach the frame and whether work will happen in phases. List any delivery or access limits already set by the builder or site team. Include the handoff points that matter to other trades.
Write down what is included
State whether the request covers labour only or includes material supply, trusses, sheathing, connectors, equipment and cleanup. Identify exclusions and how changes will be approved. Clear scope keeps an estimate from being mistaken for a final agreement.
Before you request an estimate
- Current architectural and structural drawings with revision dates
- Project type, approximate area and number of levels
- Framing work to include, with known exclusions
- Target start window, delivery access and site notes
If some information is not ready, label it as pending. The team can tell you what is needed next.
Common questions
What should I send first?
Send the latest drawings, a short scope description, the project location and a target start window.
Can you review a project while the drawings are in progress?
Yes. Label the set as preliminary and identify what is still being developed. A proposal may need revision when the design changes.
Does a service-area page confirm a start date?
No. Moonlite confirms project fit and availability after reviewing the scope and schedule.