Explain what is being built
Describe the building type, number of levels, approximate floor area and framing scope. For an addition or alteration, point out the existing structure that remains and the planned connection between old and new work. The design professional’s drawings govern structural details.
Share the current plan set
Send architectural plans, structural drawings, sections and relevant schedules with the latest revision date. Identify details that are pending, such as a truss layout or engineered-member schedule. That helps separate a preliminary estimate from a price based on a complete set.
Describe access and occupied areas
Tell us where materials can be dropped, how the crew reaches the work area and whether any part of the building remains occupied. Note known limits on access, storage or work sequence. These practical details help the team plan the work without guessing.
Confirm the project roles
Before work begins, agree who manages permits and inspections, who coordinates design questions, and who approves changes. Keep the responsible builder and design professionals involved when a field condition differs from the drawings.
Before you request an estimate
- Current architectural and structural drawings with revision dates
- Project type, approximate area and number of levels
- Framing work to include, with known exclusions
- Target start window, delivery access and site notes
If some information is not ready, label it as pending. The team can tell you what is needed next.
Common questions
What should I send first?
Send the latest drawings, a short scope description, the project location and a target start window.
Can you review a project while the drawings are in progress?
Yes. Label the set as preliminary and identify what is still being developed. A proposal may need revision when the design changes.
Does a service-area page confirm a start date?
No. Moonlite confirms project fit and availability after reviewing the scope and schedule.